
Recently SRS was hired to upgrade an existing 3 MMGY Northern California plant to replace older, less productive technologies with the latest technologies available at that time. We did this in 2 phases.
Phase 1
SRS constructed a methanol recovery tower (called the SRXC-Series) as well as a cold soak system (BD19 Resin System.
Phase 2
SRS built a bleaching and degumming system (BDGM) and built a solid catalyst esterification system.





The resource requested could not be found on this server!
Please be advised that LiteSpeed Technologies Inc. is not a web hosting company and, as such, has no control over content found on this site.