
Recently SRS was hired to upgrade an existing 3 MMGY Northern California plant to replace older, less productive technologies with the latest technologies available at that time. We did this in 2 phases.
Phase 1
SRS constructed a methanol recovery tower (called the SRXC-Series) as well as a cold soak system (BD19 Resin System.
Phase 2
SRS built a bleaching and degumming system (BDGM) and built a solid catalyst esterification system.





© 2013 SRS International All Rights Reserved
Home | Information | Technologies | Projects | Our Services | Biodiesel News | About Us | Contact Us
Site Developed by ProSites.com
